119 Turkey Barn

These structures are designed for the care and housing of turkeys at ground level.  Costs given are averages for open non-environmental (curtain) buildings with predominantly dirt floors.

The following are not included in the costs: Racks, cages, incubators and other special equipment.

The following are related occupancies:

474  Poultry House, Cage Operation, 1 Story

570  Poultry House, Cage Operation, 1 Story Elevated

567  Poultry House, Cage Operation, 2 Story

568  Poultry House, Cage Operation, 2 Story Elevated

569  Poultry House, Cage Operation, 3 Story

115  Poultry House, Cage Operation, Screened, 1 Story

125  Poultry House, Cage Operation, Screened, 1 Story Elevated

116  Poultry House, Cage Operation, Screened, 2 Story

126  Poultry House, Cage Operation, Screened, 2 Story Elevated

117  Poultry House, Floor Operation, Breeder

118  Poultry House, Floor Operation, Broiler

Availability of Elevators by Area for this occupancy: No

Marshall Valuation Service sections: 17 and 47.

Typical Lives:

 

 

 

 

 

Class

 

 

 

 

Quality

A

B

C

D

H

M

P

S

W

Low

--

--

--

15

15

--

15

15

--

Average

--

--

--

15

15

--

15

15

--

Good

--

--

--

20

20

--

20

20

--

Excellent

--

--

--

20

20

--

20

20

--

Quality Selection Guide

Class D (Wood or Steel Framed Exterior Walls):

Quality

Exterior Walls

Interior Finish

Mechanicals

HVAC

Low

Plywood partial walls, side screen on wood studs, no curtains.

Open ventilation, unfinished, dirt floor, no insulation.

Minimum lighting and hose bib.

None

Fair

Siding, insulated, sidewall open screen, side curtains.

Unfinished, dirt floor, some concrete, insulated ceiling.

Adequate services

 

Average

Siding, insulated, sidewall top open screen, curtains and shutters.

Unfinished, partial floor, few partitions, insulated ceiling.

Adequate wiring and lighting, water service.

None

Class H (Hoop Frame):

Quality

Exterior Walls

Interior Finish

Mechanicals

HVAC

Low

Wood post, light pipe hoop, fabric cover.

Open ventilation, unfinished, dirt floor, wire fence pens.

Minimum lighting and hose bib.

None

Average

Wood post, knee wall, pipe hoop frame, fabric cover, end curtains.

Unfinished, dirt floor, some concrete.

Minimum services

None

Class P (Pole Frame):

Quality

Exterior Walls

Interior Finish

Mechanicals

HVAC

Low

Metal partial walls, side screen on light pole frame, no curtains.

Open ventilation, unfinished, dirt floor, no insulation.

Minimum lighting and hose bib.

None

Fair

Metal, insulated, sidewall open screen, side curtains.

Unfinished, pole frame, dirt floor, some concrete, insulated ceiling.

Adequate services

None

Average

Metal, insulated, sidewall top open screen, curtains and shutters.

Unfinished, partial floor, few partitions, insulated ceiling.

Adequate wiring and lighting, water service.

None

Class S (Metal Frame and Walls):

Quality

Exterior Walls

Interior Finish

Mechanicals

HVAC

Low

Metal partial walls, side screen on light steel frame, no curtains.

Open ventilation, unfinished, dirt floor, no insulation.

Minimum lighting and hose bib.

None

Fair

Metal, insulated, sidewall open screen, side curtains.

Unfinished, steel frame, dirt floor, some concrete, insulated ceiling.

Adequate services

None

Average

Metal, insulated, sidewall top open screen, curtains and shutters.

Unfinished, partial floor, few partitions, insulated ceiling.

Adequate wiring and lighting, water service.

None