118 Poultry House, Floor Operation, Broiler

These structures are designed for the raising and housing of poultry at ground level.  Costs are averages for open non-environmental (curtain) and enclosed environmental buildings at the average and above quality levels.  These structures will have an all dirt floor.

The following are not included in the costs: Racks, cages, incubators and other special equipment.

The following are related occupancies:

474  Poultry House, Cage Operation, 1 Story

570  Poultry House, Cage Operation, 1 Story Elevated

567  Poultry House, Cage Operation, 2 Story

568  Poultry House, Cage Operation, 2 Story Elevated

569  Poultry House, Cage Operation, 3 Story

115  Poultry House, Cage Operation, Screened, 1 Story

125  Poultry House, Cage Operation, Screened, 1 Story Elevated

116  Poultry House, Cage Operation, Screened, 2 Story

126  Poultry House, Cage Operation, Screened, 2 Story Elevated

117  Poultry House, Floor Operation, Breeder

119  Turkey Barn

Availability of Elevators by Area for this occupancy: No

Marshall Valuation Service sections: 17 and 47.

Typical Lives:

 

 

 

 

 

Class

 

 

 

 

Quality

A

B

C

D

H

M

P

S

W

Low

--

--

--

--

--

--

15

15

--

Average

--

--

--

--

--

--

15

15

--

Good

--

--

--

--

--

--

20

20

--

Excellent

--

--

--

--

--

--

20

20

--

Quality Selection Guide

Class P (Pole Frame):

Quality

Exterior Walls

Interior Finish

Mechanicals

HVAC

Lowest

Metal or plywood partial walls or screen on light pole frame.

Open ventilation, unfinished, dirt floor, no insulation.

Minimum lighting and hose bib.

None

Low

Metal, insulated, sidewall top open screen, no curtains.

Unfinished, pole frame, dirt floor, insulated ceiling.

Minimum services

None

Fair

Metal, insulated, sidewall top open screen, curtain sidewalls.

Unfinished, dirt floor, insulated ceiling.

Minimum wiring and lighting, water service.

None

Average

Pole frame, metal siding insulated, shutters or vents.

Insulated ceiling, plywood interior, dirt floor, some subdivision.

Adequate lighting and water service.

None

Good

Pole frame, metal siding, fully insulated, ventilated.

Insulated ceiling, interior sheathing, dirt floor, subdivided.

Adequate lighting and water service.

None

Class S (Metal Frame and Walls):

Quality

Exterior Walls

Interior Finish

Mechanicals

HVAC

Lowest

Metal partial walls or screen on light steel frame.

Open ventilation, unfinished, dirt floor, no insulation.

Minimum lighting and hose bib.

None

Low

Metal, insulated, sidewall top open screen, no curtains.

Unfinished, steel frame, dirt floor, insulated ceiling.

Minimum services

None

Fair

Metal, insulated, sidewall top open screen, curtain sidewalls.

Unfinished, dirt floor, insulated ceiling.

Minimum wiring and lighting, water service.

None

Average

Steel siding and frame, insulated, shutters or vents.

Insulated ceiling, plywood interior, dirt, some division of space.

Adequate lighting and water service.

None

Good

Steel panels and frame, fully insulated, ventilated.

Insulated ceiling, interior sheathing, dirt floor, subdivided.

Adequate lighting and water service.

None