496 Laboratory

Laboratories include commercial and research and development facilities exclusive of lab equipment. Interiors will have clean surfaces with good enamels, vinyl and glazed tiles and conductive flooring commensurate with the quality level. Costs include laboratory plumbing, electrical and cabinetry, but not fume hoods.

The better qualities are highly ornamented with good offices, testing areas, research and numerous workstations.

Since laboratories have higher requirements for heating, cooling and ventilation, use component 617 (Complete HVAC) for HVAC costs.

Availability of Elevators by Area for this occupancy: Yes

Marshall Valuation Service sections: 14 and 44.

Typical Lives:

 

 

 

 

 

Class

 

 

 

 

Quality

A

B

C

D

H

M

P

S

W

Low

50

50

45

40

--

--

--

40

--

Average

50

50

45

40

--

--

--

40

--

Good

55

55

50

45

--

--

--

45

--

Excellent

55

55

50

45

--

--

--

45

--

Quality Selection Guide:

Class A (Fireproof Structural Steel Frame): and Class B (Reinforced Concrete Frame):

Quality

Exterior Walls

Interior Finish

Mechanicals

HVAC

Low

Brick, precast concrete, block, little trim

Low-cost finishes, acoustic tile, VCT, plain labs, production and offices

Minimum lab lighting & plumbing, few extras

Complete HVAC.

Average

Brick, concrete or metal panels, formed concrete

Plaster or drywall, acoustic tile, VCT, carpet, good labs and support

Adequate lighting & plumbing, some extra features

Complete HVAC.

Good

Face brick, stone, concrete or metal panels, solar glass

Plaster or drywall, acoustic tile, carpet and vinyl, good testing and research

Good fluorescent fixtures, good lab stations and plumbing

Complete HVAC.

Excellent

Stone, best brick, metal and glass, highly ornamental

Plaster, glazed finishes, enamel, tile, many workstations, support facilities

Best lab plumbing and lighting, many extras

Complete HVAC.

Class C (Masonry Bearing Walls):

Quality

Exterior Walls

Interior Finish

Mechanicals

HVAC

Low

Brick, block, tilt-up panels, bearing walls, wood joists, little trim

Painted walls, acoustic tile or drywall, VCT, plain labs and offices

Minimum lab lighting & plumbing

Complete HVAC.

Average

Steel frame or bearing walls, brick, block, or concrete, some trim

Plaster or drywall, acoustic tile, VCT, adequate labs, support facilities

Adequate lighting, plumbing and workstations

Complete HVAC.

Good

Steel columns, web or bar joists, ornamental block or face brick

Plaster or drywall, acoustic tile, vinyl or carpet, good research & development

Good fluorescent fixtures, lab stations and plumbing

Complete HVAC.

Excellent

Steel frame, face brick, metal panels, tile, highly ornamental

Plaster, glazed finishes, enamel, tile, carpet, vinyl, good support facilities

Best lab stations and plumbing, good lighting and outlets

Complete HVAC.

Class D (Wood or Steel Framed Exterior Walls):

Quality

Exterior Walls

Interior Finish

Mechanicals

HVAC

Low

Wood frame, stucco or siding, little ornamentation

Drywall, acoustic tile, vinyl composition, plain labs, production and offices

Minimum lab lighting & plumbing

Complete HVAC.

Average

Wood frame or pipe columns, good stucco or siding with some trim

Plaster or drywall, acoustic tile, VCT, adequate labs, support facilities

Adequate lighting, plumbing and workstations

Complete HVAC.

Good

Steel or glulam frame and joists, brick veneer, glass, best stucco

Plaster or drywall, acoustic tile, vinyl or carpet, good research & development

Good fluorescent fixtures, lab stations and plumbing

Complete HVAC.

Excellent

Steel or wood frame, brick or stone veneer, metal and glass, ornamental

Plaster, glazed finishes, enamel, tile, carpet, vinyl, good support facilities

Best lab stations and plumbing, good lighting and outlets

Complete HVAC.

Class S (Metal Frame and Walls):

Quality

Exterior Walls

Interior Finish

Mechanicals

HVAC

Low

Pre-engineered, finished interior, insulation

Drywall, acoustic tile, vinyl composition, plain labs, production and offices

Minimum lab lighting and plumbing

Complete HVAC.

Average

Pre-engineered, sandwich panels, some trim

Plaster or drywall, acoustic tile, VCT, adequate labs, support facilities

Adequate lighting, plumbing and workstations

Complete HVAC.

Good

Pre-engineered, good sandwich panels, some brick or stone

Plaster or drywall, acoustic tile, vinyl or carpet, good research & development

Good fluorescent fixtures, lab stations and plumbing

Complete HVAC.